A RACI chart in Excel is a table: activities down the side, and the four roles across, either as letters under people's names or as four columns of names. The useful check is the same either way. Every activity has at least one person doing it, and exactly one person who answers for it.

The four letters

The Wikipedia article on the responsibility assignment matrix gives the four roles, and it says that according to some theories of project management there must be only one accountable stakeholder for each task:

  • Responsible. Those who complete the task. At least one. Others can be delegated to help.
  • Accountable. The one who answers for the task being completed correctly, and who signs off the work. There is one.
  • Consulted. People whose opinions are sought, such as subject-matter experts. The conversation goes both ways.
  • Informed. People kept up to date, often when the task is done. That communication is one way.

Consulted is not a second owner. Informed is not someone you are waiting on. One person can be both Responsible and Accountable on a small task. That is still one Accountable name.

Two layouts that Excel can hold

  1. Put activities in the first column and roles across the top (Sponsor, Project manager, Tech lead). Type R, A, C or I in the cells. Leave a cell blank when that role has no part in that activity.
  2. Put activities in the first column and then four columns: Responsible, Accountable, Consulted, Informed. Type names. Several names in one cell are separated with a comma.

Read down each role in the letter grid. A person who is Accountable on every row will not look at the chart. A person who is only Informed does not owe you the work.

The RACI matrix builder is the second layout. You type names, not letters. "Tech lead, Test lead" is two people. A title with no comma, such as "Sales and marketing", stays one name. Blank activities are dropped. The other rows stay in the order you entered them. A row with nobody Accountable, more than one Accountable, or nobody Responsible is kept, and the gap is named. The builder does not delete that row and it does not pick the Accountable person for you.

Download CSV when the gaps you care about are gone. Excel and Google Sheets open that file. A cell that starts with =, +, - or @ gets a leading apostrophe in the CSV, unless it is a plain number, so the spreadsheet does not treat the name as a formula. The chart is built in the browser. A worked IT example, which is the one the builder loads, is in A RACI matrix example for an IT project.

Suggestion lists for "how to create a raci chart in excel" include a template, "with data", "for project management", and "how to create a raci matrix in excel". The same idea under both names. The RAID Log & Governance Kit is the Excel file of this chart together with a RAID log, a 5 by 5 heat map, action, decision and change logs, and a stakeholder register. The heat map counts ratings that were entered. It does not make the call. There are no macros.

What the builder records

Opening the builder sends a page view to this site. Building the matrix sends a product use when the chart is produced. A build that does not produce a chart does not send that event. Both go out as a beacon (POST /api/t) with the page address, the site that linked here, a campaign tag if the link had one, and a width class: under 640 pixels, under 1024, or wider. The beacon does not include the words you type. Scrolling records depth at 25, 50, 75 and 100 percent. A click records where it landed, as percentages, plus the element's tag, id or class, and not the text. If the browser sends Do Not Track or Global Privacy Control, the script stops before sending, and the server drops a beacon that still arrives with that signal. The privacy page is the full account.